Isuzu pure electric garbage truck chassis,also named Isuzu new energy truck chassis or Isuzu electric power cab truck.The best-selling Isuzu electric compression garbage trucks on the market may vary depending on the region, time period and market demand. However, based on some public information and market trends, some popular brands and models can be summarized.
Features: Isuzu pure electric garbage truck chassis is specially designed for compression garbage trucks, with high integration and modular characteristics. The battery layout of this chassis is regular, usually located in the center or bottom of the chassis, which is conducive to improving the safety and performance of the battery.
Best-selling brands
Isuzu Powerstar trucks:
Powerstar trucks has performed well in the field of new energy sanitation vehicles and has a leading sales volume.
Its electric compression garbage trucks have won wide recognition in the market with advanced technology and reliable quality.

Best-selling models
Although the specific best-selling models may vary due to market changes, some representative and well-received models include:
Isuzu brand electric compression garbage trucks:
As a well-known domestic automobile manufacturer, Isuzu's electric compression garbage trucks have a high reputation and reputation in the market.
Representative models include ISUZU EKV600 compression garbage truck, ISUZU NPR electric 10 cubic compression garbage truck, ISUZU EVF 15cbm refuse compactor truck, etc.
Market Trends
New Energy Sanitation Vehicle Sales Growth:
According to the data from Electric Vehicle Exchange, the sales of new energy sanitation vehicles have shown a trend of increasing month by month.
In particular, in September 2024, the sales of new energy sanitation vehicles reached 1,179 units, a year-on-year increase of 61%, setting a record high.
Policy promotion:
With the country's emphasis on environmental protection and energy conservation and emission reduction, new energy sanitation vehicles have been supported and promoted by policies.
This will further promote the development and popularization of new energy sanitation vehicles such as electric compression garbage trucks.
2Ton ~ 4 Ton Isuzu pure electric truck chassis cab for garbage truck application:
|
Overall Dimension(L x W x H) |
5900×1980×2150 (mm) |
|
|
Vehicle Parameters |
Curb Weight: |
2450kg |
|
GVW: |
4495kg |
|
|
Wheelbase: |
3360mm |
|
|
Drive Type: |
Motor Direct Driving |
EV100/EVM600 4x2 Electric Truck Chassis Specifications
|
Chassis Model: |
QL1041BEVECHA2Y |
|
|
Overall Dimension(L x W x H) |
5900×1980×2150 (mm) |
|
|
Vehicle Parameters |
Curb Weight: |
2450kg |
|
GVW: |
4495kg |
|
|
Wheelbase: |
3360mm |
|
|
Drive Type: |
Motor Direct Driving |
|
|
Driving Motor |
Model No.: |
YTD060W23 |
|
Type: |
Permanent magnet synchronous motor |
|
|
Rated/Peak Power: |
60/110kw |
|
|
Rated/Peak Torque: |
310/1000N.m |
|
|
Battery |
Type/Model/Brand: |
Lithium iron phosphate battery/CB220/CATL |
|
Capacity: |
106.95kwh |
|
|
Voltage: |
537.6V |
|
|
Performance |
Maximum Speed: |
100km/h |
|
Driving Range: |
260km |
|
|
Charge mode: |
Fast charge(1h) |
|
|
Max Climb Capability |
30% |
|
|
Cabin |
Front Seat: |
2 |
|
Front/ Rear Wheel Distance: |
1504/1525mm |
|
|
Front/Rear Suspension |
1015/1525mm |
|
|
Chassis |
Axle Loads: |
1805/2690kg |
|
Approach/Departure angle: |
19/16° |
|
|
Leaf Spring: |
3/3+2 |
|
|
Tires: |
7(Including Spare Tire) |
|
|
Tire Model: |
7.00R16-8PR |
|
|
1 |
Power Steering System |
|
|
Standard Configuration:
|
2 |
AC |
|
3 |
ABS |
|
|
4 |
Tubeless Tires |
|
|
5 |
Widen Bumper |
|
|
6 |
Brake clearance self-adjustment |
|
|
7 |
Tilting cab |
|
|
8 |
Start anti-sliding |

Isuzu pure electric garbage truck chassis cab technical drawing





New Isuzu new energy garbage truck chassis cab technical drawing




4Ton ~ 8Ton Isuzu pure electric truck chassis cab for garbage truck application:
EV700 is the typical model of the light duty electric truck chassis with more horsepower. From cutting-edge fuel efficiency and industry-leading powertrain system to our current zero-emission commercial electric truck, we come a long way to be actively supportive for the basic policy of environmental reservation. Different countries require different fuel conditions to operate internal combustion engines well, now with the background of launching electric vehicles, there won’t be any difference among the world.
The e-motor, for the model EV700, the CATL LFP, 1 hour charging, has the power of 218.54kwh, allowing for a driving range up to 240km. Payload capacity is going up to 5490kg, and the front/rear axle capacity is 3700/6800kg. Wheelbase 4175mm and 7430mm overall length make it possible to be modified onto different body applications.
We are ready to enter the future by building the greenest possible commercial trucks on the road. We will also continue to stick on our mission of better profiting our customers. No business will ever getting bigger by only benefiting itself.
|
Vehicle Model: |
QL1100BEVEMLAY |
|
|
Dimensions and Parameters |
Overall Dimension(L x W x H) |
7430×2200x2285mm |
|
Wheelbase: |
4175mm |
|
|
Front/ Rear Wheel Distance: |
1680/1650mm |
|
|
Front/Rear Suspension: |
1110/2145mm |
|
|
Weights and Capacities |
Curb Weight: |
4830kg |
|
GVW: |
10500kg |
|
|
Axle Loads: |
3700/6800kg |
|
|
Driving Motor |
Model: |
TZ370XS-LKM0851 |
|
Type: |
PMSM |
|
|
Rated/Peak Power: |
75/120kw |
|
|
Cabin |
Number of Seats: |
3 |
|
Chassis |
Drive Type: |
4x2 |
|
Tires: |
7(Including 1 Spare Tire) |
|
|
Battery |
Type: |
LFP |
|
Capacity: |
218.54kwh |
|
|
Charge mode: |
Fast Charge(2h) |
|
|
Standard Configurations: |
Air Conditioning |
|
|
Radio |
||
|
ABS |
||

Japan Isuzu heavy duty EV electric cab chassis technical drawing




10Ton ~ 15Ton Isuzu pure electric truck chassis cab for garbage truck application:
EVF is the typical model of the medium duty commercial electric truck chassis. With the payload capacity coming up to 11100kg, wheelbase 5550mm, it can be modified into various body applications, while operating at a lower cost than traditional fuel engines. High maneuverability, high perfromance, no doubt that EVF will promote drivers’ satisfaction to a whole new level by providing a spacious and benign green environment stated in both comfort and advanced features.
The e-motor, for the model EVF, the CATL LFP, within 3 hours charging, has the power of 246.67kwh, allowing for a driving range more than 220km, resulting in the smooth ride and free of noise. Our trucks can be plugged in to recover charge throughout day or night, rationally utilizing routine downtime during breaks and shift changes.
Trucks serve an important purpose all over the world. Commercial automotive has been an imperative industry, particularly to support health care, the food system, and e-commerce order in this rigorous time of COVID-19. Making the decision that shift to commercial electric vehicles is crucial to reduce transport sector greenhouse gas emissions.
We put the customer at the center of everything we do. Our goal will be to make electric trucks that are as tough as their drivers. The EV truck will be part of the cornerstone that helps the world become a better place.
|
Vehicle Model: |
||
|
Dimensions and Parameters |
Overall Dimension(L x W x H) |
8685×2530×2650mm |
|
Wheelbase: |
5550mm |
|
|
Front/ Rear Wheel Distance: |
1960/1855mm |
|
|
Front/Rear Suspension: |
1335/1800mm |
|
|
Weights and Capacities |
Curb Weight: |
6750kg |
|
GVW: |
18000kg |
|
|
Axle Loads: |
6500/11500kg |
|
|
Driving Motor |
Model: |
GC-TM1300-01 |
|
Type: |
PMSM |
|
|
Rated/Peak Power: |
100/185kw |
|
|
Cabin |
Number of Seats: |
3 |
|
Chassis |
Drive Type: |
4x2 |
|
Tires: |
7(Including 1 Spare Tire) |
|
|
Battery |
Type: |
LFP |
|
Capacity: |
246.67kwh |
|
|
Charge mode: |
Fast Charge(2h) |
|
|
Standard Configurations: |
Air Conditioning |
|
|
Radio |
||
|
ABS |
||


In summary, the best-selling Isuzu electric compression garbage trucks on the market may vary depending on the region and time, but Isuzu electric compression garbage trucks from brands such as Isuzu powerstar trucks and other brands have high visibility and competitiveness in the market. At the same time, with the continuous development of the new energy sanitation vehicle market and the promotion of policies, the sales of electric compression garbage trucks are expected to continue to grow.






