Products
Home / Isuzu Garbage Trucks / Isuzu Garbage compactor truck /

Isuzu electricity 6 cbm rear loader for Dominica

Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck
Isuzu EVM600 6cbm electric rear loader truck

Isuzu electricity 6 cbm rear loader for Dominica

The Isuzu EVM600 electric garbage compactor truck,with 3360mm wheelbase, a CATL 106.95kWh battery, a Suzhou Green Control TZ370XS-LKM1201 drive motor, and a 6-cubic-meter carbon steel garbage bin with anti-corrosion and rust-proof treatment. It also has a rear-mounted bin-tipping mechanism that can suspend a 240L standard garbage bin. The vehicle is controlled by a CAN-BUS electronic control system and a hydraulic system, and can be operated via the cab, the left-side electrical control box on the tailgate, the driver's side manual hydraulic control valve, and the right-side manual control lever on the tailgate. The compression ratio is ≥3:1.

  • MarketPrice:

    $41700
  • Manufacturer:

    Powerstar Trucks
  • Work capacity:

    3 tons
  • Dimension:

    6850 x 2100 x 2350 mm
  • Cabin type:

    Isuzu EVM600
  • Wheelbase:

    3365 mm
  • Engine power:

    106.95 kwh
  • Engine type:

    CATL Lithium iron phosphate
  • Gear box:

    TZ370XS-LKM1201 Driving Motor
  • Remarks:

    Fast charge(1.5h), 240km endurance mileage

In today's sanitation sector, pure electric garbage compactor trucks, characterized by zero emissions and low noise, are ideal equipment for building green and smart cities. The Isuzu electricity 6 cbm rear loader for Dominica was developed to meet this market demand. It features a high-capacity CATL 106.95kWh battery and a high-efficiency drive motor, is environmentally friendly, and is controlled by an intelligent CAN-BUS system. With a compression ratio of up to 3:1, it boasts a large single-load capacity and multiple flexible and reliable operating positions, significantly improving urban waste collection efficiency and enhancing the city's cleanliness.

* Isuzu EVM600 6 cbm rear loader truck *

Isuzu electricity 6 cbm rear loader for Dominica

 

▶ Features:

★ Isuzu EVM600 electric chassis,240km Endurance mileage

★ TZ370XS-LKM1201 Drive Motor,Rated 100/ Peak 185kw Power

★ CATL 106.95kwh 106.95kwh Battery

★ High compression ratio, large loading capacity

★ CAN bus control, high integration,multiple operation points

 

 

▶ Product Parameters:

Isuzu EVM600 6cbm electric rear loader truck

Parameters

Overall Dimension(L x W x H)

7030x2095x2560mm

Curb Weight

4850kg

GVW

8995kg

Wheelbase

3365mm

Drive Type

Motor Direct Driving

Motor

Motor Model

TZ370XS-LKM1201

Motor Type

Permanent magnet synchronous motor

Rated /Peak Power

100/185kw

Auxiliary motor controller

Rated input voltage

600Vdc

DC/AC Output voltage

380Vac

DC/AC rated/peak power

5.5/7.5kW

DC/AC rated/peak Current

13/19.5A

DC/DC rated power/ current

3Kw/110A

 

 

Battery

Battery Brand

CATL

Battery Type

Lithium iron phosphate

Battery Capacity

106.95kwh

Rated capacity of power battery system

173Ah

Rated voltage of power battery system

618.2V

Nominal voltage

154.56V

Nominal energy

26.73 kwh

Performance

Maximum Speed

100km/h

Endurance mileage

240km

Charge mode

Fast charge(1.5h)

Chassis

Seat

3

Axle Loads

3300/5695kg

Tire Model:

7.50R16LT 16PR

Upper body

Garbage container

6CBM

Material

Carbon steel, Side 4mm, Bottom 5mm

Design

Whole unit with Leakage Proof Design

Sewage tank

200 liters

Filling work cycling time

 20~25 s

Garbage Compact Ratio

≥3:1

Control system

CAN-BUS electric control system and manual operation device

 

Working Pressure

16 MPa

 

Isuzu EVM600 6cbm electric rear loader truck

▶  Chassis System:

• Brand/Model: Isuzu EVM600

 

• Drive Type: Pure Electric

 

• Wheelbase: 3360mm

 

• Battery System: Equipped with high-quality CATL lithium iron phosphate batteries, with a total capacity of 106.95 kWh. The battery system features high energy density, long cycle life, and high reliability, meeting the endurance requirements of all-day high-intensity operation.

 

• Drive Motor: Utilizes Suzhou Green Control TZ370XS-LKM1201 permanent magnet synchronous drive motor, offering strong power, efficient and stable operation, good energy recovery, a range of 240km, support for 1.5h fast charging, and a 600Vdc auxiliary motor controller.

  • Isuzu EVM600 6cbm electric rear loader truck
  • Isuzu EV series electric garbage compactor truck
  • Isuzu electricity EV refuse compactor truck

 

▶  Upper Structure Design:

• Container Volume: 6 cubic meters (large effective loading capacity after compression)

 

• Container Material: High-strength carbon steel, with anti-corrosion and rust-proof treatment

 

Isuzu electricity EV refuse compactor truck

 

 

• Compactor Mechanism: Utilizes efficient push-plate compression technology with a compression ratio ≥ 3:1, significantly increasing the single-load garbage capacity, reducing transfer frequency, and improving operational efficiency.

 

• Bin Hanging Mechanism: Equipped with a standard bin tilting mechanism at the rear, it can adapt to and automatically tilt 240L standard plastic garbage bins, achieving automated and sealed garbage collection, saving labor and ensuring hygiene.

 

Isuzu EVM600 6cbm waster compactor truck

 

▶  Intelligent control and diverse operation:

 

It adopts an advanced CAN-BUS digital electronic control system, which controls the collection, compression, and unloading of garbage through multiple points, including the electronic control box in the cab, the manual hydraulic operating valve on the side of the cab, the electronic control box on the left side of the tailgate, and the manual operating lever on the right side of the tailgate.

  • Cabin electric control box
  • Drive side manual joystick
  • tailgate electric control box

 

Tailgate manual operate lever

Technical drawing of Isuzu EVM600 6cbm waster compactor truck

Technical drawing of Isuzu EVM600 6cbm waster compactor truck

 

▶  Test:

Before shipping this batch of Isuzu electric rear lift garbage trucks, we conducted performance tests, including battery endurance tests, compression tests, loading and unloading operations (various operating buttons, levers, etc. of each operating device), and exterior paint checks, to ensure that the vehicles were delivered to customers in perfect condition.

 

Isuzu electricity EV refuse compactor truck test

 

Isuzu electricity EV refuse compactor truck test

 

▶  Application:

In the Dominican market, the Isuzu EVM600 6-cubic-meter electric compactor garbage truck, with its powerful 106.95kWh battery and efficient motor, easily handles the frequent collection operations in tropical cities like Santo Domingo. The 6-cubic-meter carbon steel body offers moderate garbage carrying capacity, and the vehicle employs bidirectional compression technology with a compression ratio ≥ 3:1, further increasing the amount of garbage loaded per load. The rear-mounted bin-lifting mechanism is compatible with local 240L standard garbage bins, enabling automated garbage collection. The CAN-BUS bus electronic control system, combined with multiple electronic and manual controls, ensures smooth operation and high efficiency. Pure electric drive achieves zero emissions and low noise, aligning with the vision of sustainable urban development and improving the quality of sanitation services.

 

Dominica 6cbm electric trash compactor truck isuzu

Dominica 6cbm electric trash compactor truck isuzu

 

Send A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

New Products

Related Products
You may be interested in the following products...
Factory 3cbm-5cbm ISUZU Truck Garbage Compactor Supplier

End-Loading Compacting Garbage Truck,10000L ISUZU Garbage Truck DimensionsGarbage Compactor Truck,16m3 Garbage Truck / Garbage Compactor Truck/ Refuse Collection Truck / Sanitation Rear Loading Garbage Truck with HydraulicCompactor System,High Quality Compactor Garbage Truck China Isuzu Garbage Compactor Truck, 4X2 LightGarbage Truck, Compression Garbage Truck,ISUZU 4X2 10ton 15tons Compressed GarbageTruck Garbage Compactor Truck,JAPANESE ISUZU 16cbm Compactor Garbage TruckCompress Garbage Truck,ISUZU 4*2 LHD Chassis Rear CompactorGarbage Truck

Learn More
low price 3tons ISUZU Rubbish Compressed Truck with 4KH1 engine

6 Wheeler ISUZU 5cbm Compressed GarbageTruck, Mini Garbage Compactor Truck,ISUZU 4*2 Euro IV Garbage Compactor Truck,ISUZU 13cbm Refuse Compactor GarbageTruck,4*2 Dump Type Compactor Garbage Truck,ISUZU Garbage Compress Truck 4X2 12cbmCompactor Truck,4X2 10cbm Foton Compression Garbage TruckGarbage Compactor Truck

Learn More
Hydraulic 3tons 5Tons Isuzu Garage Truck for waste transportation

China Competitive Price Garbage Compressor Truck,Isuzu 12m3 Compressed Garbage Truck for Hot Sales,Sinotruck ISUZU Garbage Compression Truck,ISUZU 6X4 Compression Type Garbage Truck/Garbage,  ISUZU 6X4 Garbage Truck Rear Loading for Sale,10m3 Compressed Garbage Truck, Garbage Compactor, Compression Refuse Collector, Waste Compactors

Learn More
rear loader type 8Cubic meter ELF ISUZU Refuse Truck Compactor

ISUZU chassis 13 cubic meters garbage refuse compactor truck,Refuse Compactor Garbage Truck Garbage Compactor Truck for Best Selling in Middle East,Heavy Duty 6X4 JAPANESE ISUZU CompactorGarbage Truck,ISUZU Carbage Truck /Garbage Compactor Truckfor Sale,6cbm ISUZU 4X2 Compactor Garbage Truck,3 Cubic 4cubic 5cubic Isuzu 600p 4X2 Compactor Garbage Truck 6cbm ISUZU 4X2 Compactor Garbage Truck,Isuzu Rear-Loading Garbage Compressor Truck 10cbm

Learn More
Durable quality 10Cbm-12Cbm 4*2 Isuzu Garbage Truck Compactor

ISUZU 4X2 8cbm 10cbm Garbage CompactorTruck,Euro 5 ISUZU 4X2 Compactor GarbageTruck,Small New Garbage Compactor Truck,ISUZU Compactor Type 22m3 290HP GarbageTrucks,Isuzu Mini 4*2 Garbage Compactor TruckQl11109kary for Sale,JAPANESE ISUZU Garbage Truck GarbageCompactor Truck,6cbm Compactor Garbage Truck with 120HP 12m3 Garbage Compactor Truck / Refuse Collection Vehicles / Compressed Garbage Truck 16cbm Heavy Duty Garbage Truck with Compactor

Learn More

Request a quote

If you have any questions, please to contact us in time, or send an email to us, thank you for your inquiry!
Send Now
Top

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

About Powerstar

Contact Us